1/7

WLP III is located in Oupeye, near Liège, in an arable land zoning in between the Maas river and the Albert Canal. The property benefits from multimodality with motorway, waterway and railway within reach. In addition to this, it also has an excellent connection to Liège Airport.  WLP III offers 85,549 sqm of warehouse space (of which a 19,954 sqm freezer warehouse) and 5,577 sqm of offices.

  • Location

    Canal Albert 20
    4680 Oupeye
    Belgium

  • Surface

    • 91,126 sqm
    • 85,549 sqm - Warehouse
    • 5,577 sqm - Office
  • Number of units

    2
  • Delivery

    2021

points of sustainability

Water reuse

Solar panels

Smart led lighting

BrEEAM

Very Good

EV charging

Heat recovery

location

WLP III is accessible by car, truck, boat and train. The E25 motorway is less than 2km away. The site is an excellent choice for companies that need proximity to the Netherlands, Germany, Belgium and Luxembourg and in addition the fast-growing Cargo Airport of Liège.

50.729859876098, 5.6778153861648

this is a test

Directions

Highway E25
1.5 km
show route
Liège Airport
24 km
show route
Brussels Airport
104 km
show route

technical data

Free height

12.2m

Loading docks

93

Floor load

5T/sqm

Ground level doors

11

Truck parking

50

Column grid

22.8m x 12m

Car parking

286

BrEEAM

Very Good
WLP III - Trilogiport
Get in touch
Norbert Dumoulin

availability

Total space

91,126 sqm

Available space

0 sqm

Development opportunity

0 sqm

More information about WLP III - Trilogiport

Contact us