WLP III - Trilogiport
1/7
WLP III is located in Oupeye, near Liège, in an arable land zoning in between the Maas river and the Albert Canal. The property benefits from multimodality with motorway, waterway and railway within reach. In addition to this, it also has an excellent connection to Liège Airport. WLP III offers 85,549 sqm of warehouse space (of which a 19,954 sqm freezer warehouse) and 5,577 sqm of offices.
-
Location
Canal Albert 20
4680 Oupeye
Belgium -
Surface
- 91,126 sqm
- 85,549 sqm - Warehouse
- 5,577 sqm - Office
-
Number of units
2 -
Delivery
2021
points of sustainability
Water reuse
Solar panels
Smart led lighting
BrEEAM
Very Good
EV charging
Heat recovery
location
WLP III is accessible by car, truck, boat and train. The E25 motorway is less than 2km away. The site is an excellent choice for companies that need proximity to the Netherlands, Germany, Belgium and Luxembourg and in addition the fast-growing Cargo Airport of Liège.
50.729859876098, 5.6778153861648
this is a test
Directions
Highway E25
1.5 km
show route
Liège Airport
24 km
show route
Brussels Airport
104 km
show route
technical data
Free height
12.2m
Loading docks
93
Floor load
5T/sqm
Ground level doors
11
Truck parking
50
Column grid
22.8m x 12m
Car parking
286
BrEEAM
Very Good
WLP III - Trilogiport
availability
Total space
91,126 sqm
Available space
0 sqm
Development opportunity
0 sqm